Finance6 min read · Updated November 2026

How construction loans and progress payments work

Building a new home is paid for in stages, not all at once. Here is how a construction loan works, what each progress payment covers, and how to keep your budget on track.

In short
  • A construction loan pays your builder in stages as the home is built, and you only pay interest on what has been drawn.
  • Victorian contracts follow set stages: deposit, base, frame, lock-up, fixing and completion.
  • Your own funds usually go in first, so plan your cash flow before you sign.
  • Never approve a payment for a stage that is not finished.

How a construction loan is different

A normal home loan pays the full amount on settlement. A construction loan is paid out in stages as the home is built. You only pay interest on what has been drawn so far, so repayments start small and grow as the build progresses.

  • The lender values the land and the plans "as if complete" and sets a maximum loan.
  • At each stage the builder sends an invoice, the lender often sends a valuer to check the work, then pays the builder directly.
  • Many construction loans are interest-only during the build, then switch to principal and interest when the home is finished.
Key point

Lenders usually want a fixed-price building contract, council-approved plans and a building permit before they approve the construction part of the loan.

The stages, and what each payment covers

Victorian domestic building contracts follow set stages. For a contract that covers the whole home, the usual payment schedule is:

StageWhat has been builtTypical share of contract price
DepositContract signedUp to 5% (contracts of $20,000 or more)
BaseSlab poured, or footings and floor in place10%
FrameWalls and roof frame up and approved15%
Lock-upExternal walls, roof, windows and doors on35%
FixingPlaster, cabinets, internal doors and fittings in25%
CompletionFinished, certificate of occupancy issued, handoverThe balance

Source: Consumer Affairs Victoria. Your contract may differ; get advice before agreeing to any other schedule. Victoria passed new domestic building contract laws in 2025, so check which rules apply to your contract.

Watch out

A builder should only claim a stage once that stage is actually complete. If you are unsure, ask your building surveyor or an independent inspector before you approve payment.

What you pay before the bank pays

The loan rarely covers everything. Plan for:

  • Your deposit and stamp duty on the land, if you are buying it.
  • The building deposit, which is often paid from your own funds before the first draw.
  • Costs above the loan, such as variations, upgrades, landscaping, fencing and window coverings.
  • Interest during the build, plus rent or your existing mortgage if you are living elsewhere.

Most lenders release your own contribution first, then start drawing on the loan. Keep a buffer of 5–10% of the build cost for the unexpected.

Common pitfalls

  • Agreeing to variations without checking how they will be funded: the loan may not stretch.
  • Budgeting for the build but not for interest and holding costs.
  • Letting the loan approval expire before construction starts.
  • Approving a stage payment before the work is genuinely finished.
  • Forgetting the final valuation and occupancy certificate needed to release the last payment.

Questions to ask your broker

  • How much can I borrow for land and build combined, and at what valuation?
  • Is the loan interest-only during construction, and for how long?
  • How many progress payments are allowed, and is there a fee per draw?
  • What happens if the build runs over budget or over time?
  • When does the loan convert to principal and interest?
Sources and further reading

LotPlanBuildKey

One team from lot to key. 0485 528 453 · info@lot2key.com

Get a free desktop check